Planned Roadwork for Northwest Missouri, March 7-13

construction guy

St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of March 7 – 13    

All road closures and planned roadwork may be viewed on the Traveler Information Map at http://traveler.modot.org/map/.

Inclement weather may cause schedule changes in some of the planned work. There may also be moving operations throughout the region, in addition to the work mentioned below.

Atchison County

I-29 – Bridge replacement project over the Nishnabotna River (mile marker 122 – 124) through early August. Traffic is head-to-head in the northbound lanes. More info: https://www.modot.org/atchison-county-interstate-29-nishnabotna-river-bridge-rehabilitation *

Interstate 29 – Pothole patching on ramps at Watson, U.S. Route 136, Route 111 and Route W, (Exits 116, 110, 107 and 99) March 7 – 11 

U.S. Route 59 – Pothole patching from U.S. Route 136 to the Holt County line, March 7 – 11

Buchanan County

Route U – CLOSED for a bridge deck replacement project over Contrary Creek through mid-May (Contractor: Emery Sapp & Sons, Inc.)

U.S. Route 36 – Bridge rehabilitation project over the Missouri River through November. One lane is closed each direction with a 12-foot width restriction. (Contractor: Comanche Construction, Inc.)

U.S. Route 36 – RAMP CLOSED for a bridge rehabilitation project. The ramp from eastbound U.S. Route 36 to Route 759 (Stockyards Expressway) will remain closed through mid-July. (Contractor: Comanche Construction Inc.)  

I-229 – CLOSED for bridge maintenance from Highland Avenue to U.S. Route 59 (St. Jospeh Avenue), March 9 – April 29. Use I-29 and U.S. Route 36. (Contractor: PCi Roads)

Caldwell County

Route 13 – Roadside work northbound from the south city limits of Kingston to Main Street, March 9.

U.S. Route 36 – Resurfacing project eastbound only from the DeKalb County line to Hamilton, March 10 through mid-June. Some lane closures may remain in place around-the-clock.

Route CC – CLOSED for a culvert replacement from NW Hobart Drive to J.C. Penney Drive, March 10, 8 a.m. to 3 p.m.

Carroll County

Route Z – CLOSED until further notice from Route C to County Road 217 due to damage caused by a roadway slide and ongoing geological studies. Contractor bids for a repair project are currently scheduled to be part of MoDOT’s March 2022 construction project letting.

Route EE – CLOSED for a culvert replacement from 230 Road to 240 Road, March 8, 8 a.m. to 3:30 p.m.

Route T – CLOSED for a culvert replacement from 180 Road to 185 Road, March 9, 8 a.m. to 3:30 p.m.

Chariton County

Route D – Bridge maintenance at the Clarks Creek bridge, March 7 – 9. The bridge will be narrowed to one lane with flaggers directing motorists through work zone, 9 a.m. to 1 p.m. daily.

Harrison County

I-35 – Bridge rehabilitation project at the Pole Cat Creek bridge at mile marker 90, south of Bethany, through October. A 12-foot width restriction is in place. (Contractor: Widel, Inc.)

Route B – Utility work from the bridge over Panther Creek to Main Street, March 7 – 15, 9:30 a.m. to 4 p.m. The southbound lane will be closed with flaggers directing motorists through work zone.

Holt County

I-29 – Bridge maintenance northbound at the Kimsey Creek Bridge near mile marker 78, south of Mound City, through April. A 16-foot width restriction is in place. (Contractor: Omega Coatings and Construction)

Linn County

Route 139 – CLOSED for a bridge replacement project at the Lewis Creek Bridge, Feb. 8 through early June (FARM Bridge Program, Contractor: Lehman-Wilson)

Route Y – CLOSED for a culvert replacement from Bartok Rd. to Basker Rd., March 9 – 10, 8 a.m. to 3 p.m.

Mercer County

Route M – CLOSED for a bridge replacement project at the Little Muddy Creek Bridge through April. A signed detour is in place. (Contractor: Emery Sapp & Sons, Inc.) *

Route AA – CLOSED for a culvert replacement, March 7 – 11, 7 a.m. to 3 p.m. daily

Nodaway County

Route N – Roadside work from Route VV to Road 350, March 7 – 8

Route P – Roadside work from U.S. Route 136 to 320 Street, March 9 – 11

Putnam County

Route O – CLOSED for a culvert replacement from Route 149 to Ivy Trail, March 9 – 11, 8 a.m. to 3 p.m. daily

Worth County

U.S. Route 169 – Roadside work from Route 46 to the Iowa state line, March 7 – 11

---

* Indicates this bridge is included in Gov. Mike Parson’s $351 million Focus on Bridges program, which will repair or replace 250 bridges across the state.

###

Links to related information: