This website is best viewed in a browser that supports web standards.
Skip to content or, if you would rather, Skip to navigation.
March 17, 2024St. Joseph, Mo. | By: Jeremy Werner
St. Joseph, Mo. – The following is a list of general highway maintenance and construction work the Missouri Department of Transportation has planned in the Northwest Missouri region for the week of March 18-24. Inclement weather may cause schedule changes in some of the planned work. There also may be moving operations throughout the region, in addition to the work mentioned below. MoDOT asks drivers to work with us by buckling up, putting your phone down, slowing down and moving over in work zones. Andrew County U.S. Route 59 – Resurfacing project from Business U.S. 71 to Country Club Road through mid-April (Contractor: Herzog Contracting Corp.). Route O – Permit/utility work east of County Road 295, March 12-April 12. Route DD – Ditching work at County Road 372, March 21. Atchison County Route 46 – CLOSED for a bridge replacement project at the Little Tarkio Creek east of Fairfax, through May 2024. (Contractor: North Central Bridge, LLC) https://www.modot.org/missouri-route-111-missouri-route-46-and-route-yy-bridge-replacement-atchison-and-gentry U.S. Route 136 – Pothole patching from I-29 to Route M, March 18-22. Route Z – Permit/utility work, March 19-29. Buchanan County Loop 29 (Pear Street) – Resurfacing project from U.S. Route 169 (Belt Highway) to 22nd Street through mid-April (Contractor: Herzog Contracting Corp.). Route AC – Intersection and ADA improvements at Messanie Street through mid-May (Contractor: Herzog Contracting Corp.). U.S. Route 169 – Pavement repair at the Platte River bridge, March 18-28. The bridge will be narrowed to one lane with temporary traffic signals around-the-clock. Chariton County Route 5 – Shoulder work from Batts Creek Road to Doxie Avenue, March 18-20. Route C – CLOSED for a culvert replacement from Route 5 to Hurricane Branch Avenue, March 21, 7 a.m. to 3 p.m. Clinton County Route H – CLOSED for a bridge replacement project from NE Estep Road to U.S. Route 69 through November 2024. (Contractor: Phillips Hardy, Inc.) https://www.modot.org/route-h-bridge-replacement-clinton. U.S. Route 169 – Utility work southbound south of Hulse Road through March. DeKalb County Route E – CLOSED daily in 2-mile sections for a resurfacing project from Route A to U.S. Route 69, March 20-29 (Herzog Contracting Corp.). Gentry County Route YY – CLOSED for a bridge replacement project at the Bear Creek Bridge through April 2024. (Contractor: Gene Haile Excavating, Inc.) https://www.modot.org/atchison-and-gentry-counties-bridge-replacements. Route O – CLOSED for a culvert replacement from the Nodaway County line to Route B, March 19, 8 a.m. to 3 p.m. Grundy County Route V – CLOSED for a culvert replacement from 60th Street to 70th Street, March 20, 7 a.m. to 3:30 p.m. I-29 – Shoulder repair northbound at the 98-mile marker, March 18. Linn County Route U – CLOSED for a culvert replacement from Lotus Road to Mesa Road, March 18, 7 a.m. to 3:30 p.m. Route U – CLOSED for a culvert replacement from Mesa Road to Ludlow Road, March 19, 7 a.m. to 3:30 p.m. Route U – CLOSED for a culvert replacement from Kiowa Road to Lowen Road, March 21, 7 a.m. to 3:30 p.m. Livingston County Route D – CLOSED until further notice at the Rattlesnake Creek Bridge due to deterioration. This bridge is included for replacement in the Northwest Bridge Bundle. Construction is tentatively scheduled to begin in April 2024. https://www.modot.org/northwest-missouri-design-build-bridge-bundle. Routes D and DD – Sidewalk improvements in Ludlow through early April. (Contractor: BRS Construction, LLC). https://www.modot.org/route-b-route-d-and-route-k-sidewalkada-improvements-livingston. U.S. Route 36 – Resurfacing and pavement improvement project from the Coon Creek bridge in Chillicothe to the Caldwell County line through June. One lane may be closed in either direction around-the-clock. A 15-foot width restriction will be in place with a 10-foot width restriction under the U.S.Route 65 bridge and the Kansas City Sub railroad bridge in Chillicothe (Contractor: Magruder Paving, LLC). Route D – CLOSED for surveying from First Street in Ludlow to 430th Street, March 18-28, Monday through Thursday, 8 a.m. to 5 p.m. daily. Nodaway County Route 246 – CLOSED for a culvert replacement from Lion Road to Route E, March 20, 8 a.m. to 3 p.m. Route TT – CLOSED for a culvert replacement from 350th Street to 340th Street, March 21, 8 a.m. to 3 p.m. Route ZZ – CLOSED for a culvert replacement from Route V to 315th Street, March 22, 8 a.m. to 3 p.m. Worth County U.S. Route 169 – Resurfacing and slide repair project from the Iowa State line to just north of Route 46 through July 2024 (Contractor: Herzog Contracting Corp.).
--- ### |
Links to related information: |